Plasma photocatalytic waste gas treatment

FOB Reference Price:Get Latest Price
US $10,000-1,000,000 / Set | 1 Set/Sets (Min. Order)
Supply Ability:
200 Set/Sets per Quarter
Port:
shanghai or ningbo
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Type:
waste gas treatment
Substrate:
Steel
Coating:
Powder Coating
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Huier-109
Model Number:
Huier
Voltage:
380V/220V
Power(W):
40~60KW
Dimension(L*W*H):
Customized Size
Weight:
4 TONS
Certification:
CE ISO9001
Warranty:
One Year
After-sales Service Provided:
Engineers available to service machinery overseas
Train:
supply
Environmental:
protection
Color:
can be customized
Packaging & Delivery
Packaging Details
in bulk and assembly at site.packing with plastic foam in steel frame,export wooden box
Delivery Time
35days to 60days

 Plasma photocatalytic waste gas treatment

Huier focused on the development and manufacture of metal powder coating equipment 16 years.

Product Description

 

 

 

 

Powder coating line for car spring               Alumimum wheel powder coating equipment

Portal frame ED painting line                            Powder coating equipment for refrigeration

Packaging & Shipping

 

Company Information

 We are specialized in complete electrostatic powder coating line, powder coating plant, powder coating system, 

coating machine, painting machine, overhead conveyor system, spraying booth, conveyor systems and pretreatment system and so on.

Zhejiang Huier management thrives on the philosophy’ Quality creates brand and perfect quality comes from the strict and comprehensive quality management’. Every employee as a team member of Zhejiang Huier has the goal

 ‘Excellence—the interpretation of the perfect quality’.

Huier got the ISO9001 quality system certification in 2003, the Environmental Management System certification in

December 2005. From the outset with an attention to product quality with strategic high degree, the products

manufacturing processes are strictly in accordance with international quality management system, has reached

international advances level.

Company Certificate

 

FAQ

 Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 30-45 days,because our products need customized.

Q: What is your terms of payment ?

A: Negotitation

Generally  30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: